The plan, before the work
01
The inspection and test plan setting out what will be checked, against what criteria, at which point, and by whom. Assurance writes the plan; control follows it.

Quality Assurance · Construction
Quality assurance in construction is the set of planned activities that give confidence a requirement will be met. It operates on the process: the procedures, the qualifications, the plans and the records that make a correct outcome likely before any individual item is checked.
Quality control is the other half, and the two are routinely confused. Control is the checking itself, carried out on the work. Assurance is the system that decides what gets checked, by whom, against what, and what happens to the result.
Zabidou sits on the control side, measuring every item as it is made, and feeds the assurance system the dimensional evidence it is built to collect.
Zabidou in production today
QLD + VIC
Operating in factories across Queensland and Victoria today.
100%
Inspection coverage on finished items as they come off the line.
Silver
Associate Member, Australian Steel Institute.
Bronze
Member, National Precast Association Australia.
The distinction is practical rather than academic. Assurance is everything that exists before an inspector picks anything up, and it is what an auditor examines when nothing has gone wrong.
01
The inspection and test plan setting out what will be checked, against what criteria, at which point, and by whom. Assurance writes the plan; control follows it.
02
Qualifications, training records and the authority to make decisions. A check carried out by someone unqualified produces a record without producing confidence.
03
Calibration records, traceability, non-conformance and corrective action logs. These prove the system was operating, not just that one item passed.
Quality assurance rarely fails loudly. It degrades, and the usual pattern is a system that remains complete on paper while describing less and less of what actually happens.
01
Procedures written for one sequence stay in force after the sequence changes. The system is intact, audited and increasingly unrelated to the production it governs.
02
Records show that checks occurred and who signed them, without holding what was found. The file is complete and answers nothing when a question arrives.
03
As documentation grows, effort moves from checking the work to maintaining the paperwork about checking the work, and the two are not the same activity.
The strongest part of an assurance system is the part that produces evidence as a by-product of doing the work. That is what Zabidou does for dimensional checks.
Most quality records depend on a person completing them. That is unavoidable for judgement-based checks, and it is why assurance systems invest so heavily in training, authority and audit.
Dimensional checks are different, because they can be automated. Where every item is measured as it is made, the record exists because production happened, not because somebody completed a form at the end of a shift.
Zabidou measures each item inline against a Golden Sample or the drawings and holds the result against that item. The same check runs on a precast concrete bed and on a steel fabrication line.
For the plant, that means the dimensional evidence an auditor asks for is already there, complete for every item rather than for the ones that happened to be sampled, and available without anyone reconstructing a shift from memory.
This covers one part of an assurance system rather than replacing it, and procedures, qualifications, traceability and inspector judgement all stay where they are.
At handover, the output of the assurance system is summarised in a certificate of conformance.
Five checks run on every item as it is produced, and each one writes its result to the record automatically rather than waiting for a form to be completed at the end of a shift.
Complete 3D measurement and verification of as-built output against a Golden Sample or design intent, for full dimensional compliance without stopping the line.
Automated, real-time verification that components are correctly positioned before and during production, while the mould is still open or the section is still in the jig.
Inline detection of surface defects, voids and irregularities at industrial speed, fully automated and without manual inspection.
Precise measurement and verification of critical dimensions against a Golden Sample or the drawings, inline, in real time, at scale.
Manufactured-unit centric digital provenance that automatically delivers the full audit history operations, financiers and customers demand.
The clearest way to separate them is to ask what each one acts on and when it happens.
| Quality assurance | Quality control | |
|---|---|---|
| What it acts on | The process that produces the work. | The work itself. |
| When it happens | Before and around production. | During and after production. |
| What it produces | Plans, procedures, qualifications, records. | Measurements, test results, pass and fail decisions. |
| Who it answers to | Auditors and the quality system. | The specification and the drawing. |
| What failure looks like | A system that no longer describes the work. | A defect reaching the customer. |


Quality assurance is the set of planned and systematic activities that give confidence a requirement will be met. It covers the procedures, qualifications, inspection and test plans and records that make a correct outcome likely, and it acts on the process rather than on the individual item.
The term is also used loosely to mean the whole quality function, including control, which is a common source of confusion on projects.
Assurance acts on the process and happens before and around production. Control acts on the work itself and happens during and after it.
A simple test: writing the inspection and test plan is assurance, and carrying out the inspections in it is control.
Typically a quality plan, inspection and test plans, procedures for the processes being used, qualification and training records, calibration records, material traceability, and non-conformance and corrective action processes.
The specific contents are set by the contract and by whichever management system standard the organisation works to.
Each party is responsible for its own work, with the head contractor normally accountable for the system overall and for reviewing the plans of subcontractors and suppliers.
The client or superintendent commonly retains the right to audit, to attend witness points and to release hold points.
Through the records the system produces: approved plans, completed inspection records, test certificates, qualifications, calibration and the handover documentation at completion.
The practical test is whether a claim made at handover can be traced back to a record made at the time, rather than reconstructed afterwards.